Trump Tower
725 5th Avenue, Manhattan · BBL 1012927501 · BIN 1035794
One of the most-scrutinized addresses in the city. The public record follows the headlines: a steady churn of permits, complaints, and enforcement activity across four decades.
Live report · as of Jul 10, 2026 · refreshed daily
What drives the score
Jobs without a final sign-off or Letter of Completion surface in every title search, lender review, and TCO/CO application.
Long-dormant open jobs usually require re-filing or an LS-1 withdrawal before the DOB will close them.
Work performed after permit expiration cannot be inspected or signed off until the permit is renewed.
Active DOB violations must be corrected and dismissed before a Certificate of Occupancy or Letter of Completion is issued.
ECB violations carry civil penalties; unpaid balances accrue and block DOB sign-offs.
Failure-to-file and safety-equipment violations must be resolved with the issuing unit before sign-offs, and several carry compounding civil penalties.
An UNSAFE facade filing requires immediate public protection and repairs on a fixed clock — lenders and insurers treat it as a red flag.
Open complaints can trigger inspections and new violations at the worst possible moment in a transaction.
The heaviest open items
The 10 most consequential open records, straight from the city systems. Expand any card for the cure path.
Proposed HVAC renovation of Apartment 53C in conjunction with job #M01343604-I1. No change in use, egress, or occupancy.
- Work description
- Proposed HVAC renovation of Apartment 53C in conjunction with job #M01343604-I1. No change in use, egress, or occupancy.
- Filing status
- Plan Examiner Review
- Work location
- Floor Number(s) 53 through 53
- Filed
- Jul 7, 2026
- Status date
- Jul 7, 2026
- Applicant
- Gennadiy Faybyshenko (PE)
- Filing representative
- Rachel Berkowitz — Redcut Expediting
- Initial cost
- $5,000
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership.
See membershipInstallstion of new plumbing fixtures in Apartment 53C with related domestic water, sanitary and vent piping connections. No gas work proposed.
- Work description
- Installstion of new plumbing fixtures in Apartment 53C with related domestic water, sanitary and vent piping connections. No gas work proposed.
- Filing status
- Plan Examiner Review
- Work location
- Floor Number(s) 53 through 53
- Filed
- Jul 7, 2026
- Status date
- Jul 7, 2026
- Applicant
- Gennadiy Faybyshenko (PE)
- Filing representative
- Rachel Berkowitz — Redcut Expediting
- Initial cost
- $11,000
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership.
See membershipAPPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 53RD FLOOR (UNIT 53C) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
- Work description
- APPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 53RD FLOOR (UNIT 53C) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
- Filing status
- Permit Entire
- Work location
- Floor Number(s) 053 through 053
- Filed
- Sep 24, 2025
- First permit
- Oct 8, 2025
- Status date
- Jun 29, 2026
- Applicant
- Victor Famulari (RA)
- Filing representative
- Anthony Rivera Jr. — Ea Design Group, Inc.
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership.
See membershipPropose plumbing modifications at apartment 40H all as per plans herewith filed.
- Work description
- Propose plumbing modifications at apartment 40H all as per plans herewith filed.
- Filing status
- Permit Entire
- Work location
- Floor Number(s) 040 through 040
- Filed
- Oct 28, 2024
- First permit
- Jan 23, 2025
- Status date
- Jun 26, 2026
- Applicant
- Michael Gadaleta (RA)
- Filing representative
- Mike Cuevas — Socotec, Inc
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership.
See membershipPlumbing system installation associated with the interior renovation of the 39th floor, Apartment 39E.
- Work description
- Plumbing system installation associated with the interior renovation of the 39th floor, Apartment 39E.
- Filing status
- Permit Entire
- Work location
- Floor Number(s) 39 through 39
- Filed
- Apr 9, 2026
- First permit
- Jun 4, 2026
- Status date
- Jun 4, 2026
- Applicant
- Brian Mcdonough (PE)
- Initial cost
- $25,000
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership.
See membershipInterior renovation on the 39th Floor to apartment 39E . Partition changes to non-load bearing walls and finishes per plans. No change in use, occupancy or egress.
- Work description
- Interior renovation on the 39th Floor to apartment 39E . Partition changes to non-load bearing walls and finishes per plans. No change in use, occupancy or egress.
- Filing status
- Permit Entire
- Work location
- Floor Number(s) 39 through 39
- Filed
- Mar 25, 2026
- First permit
- Apr 30, 2026
- Status date
- Apr 30, 2026
- Applicant
- Nicole Anderson (RA)
- Filing representative
- Rosaly Oyola — Outsource Consultants
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership.
See membershipMechanical system installation associated with the interior renovation of the 39th floor, Apartment 39E.
- Work description
- Mechanical system installation associated with the interior renovation of the 39th floor, Apartment 39E.
- Filing status
- Approved
- Work location
- Floor Number(s) 39 through 39
- Filed
- Apr 9, 2026
- Status date
- Apr 23, 2026
- Applicant
- Brian Mcdonough (PE)
- Initial cost
- $27,000
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership.
See membershipRENOVATIONS TO EXISTING RETAIL STORE. REMOVAL OF INTERIOR WALL CLADDING AND MILLWORK. REPLACE WITH NEW DRYWALL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
- Work description
- RENOVATIONS TO EXISTING RETAIL STORE. REMOVAL OF INTERIOR WALL CLADDING AND MILLWORK. REPLACE WITH NEW DRYWALL SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
- Filing status
- Permit Entire
- Work location
- Floor Number(s) 1 through 3
- Filed
- Mar 27, 2026
- First permit
- Apr 6, 2026
- Status date
- Apr 6, 2026
- Applicant
- Louis Loria (RA)
- Filing representative
- Rosaly Oyola — Outsource Consultants
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership.
See membershipWork permit for job 120056731 — ANDRONTIN CONSTRUCTON INC
- Permit type
- EW / OT
- Work type
- OT
- Permit status
- ISSUED
- Filing status
- RENEWAL
- Issued
- Mar 27, 2026
- Expires
- Jun 20, 2026
- Job started
- Jun 8, 2009
- Permittee
- Constantin Andronache — Androntin Constructon Inc (GC 0615540)
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership.
See membershipAPPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 14TH FLOOR (MARKETING FLOOR) / 6TH FLOOR (CONSTRUCTION FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
- Work description
- APPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 14TH FLOOR (MARKETING FLOOR) / 6TH FLOOR (CONSTRUCTION FLOOR) AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY
- Filing status
- Permit Entire
- Work location
- Floor Number(s) 014 through 014
- Filed
- Feb 18, 2026
- First permit
- Mar 3, 2026
- Status date
- Mar 3, 2026
- Applicant
- Stephen Digiuseppi (RA)
- Filing representative
- Anthony Rivera Jr. — Ea Design Group, Inc.
▸ How to cure this▾ How to cure this
Cure playbooks — the exact steps, forms, deadlines, and pre-filled paperwork to clear this record — are part of a DailyDog membership.
See membership+ 379 more open records in the full sweep